Major Projects Competed:
Completed Assignments of Optimal Designs the Parent Company of Optimal Consultancy Services Pvt. Ltd:
 

Optimal Designs, has been awarded the First Prize for Excellence in Consultancy Services 2006 for their Structural Design of Jumeriah Beach Residence Project – Sector IV at Dubai, UAE.. Consultancy Development Centre, an organization supported by Department of Scientific and Industrial Research of Ministry and Science and Technology gave this award with a citation to Mr Abhay Ghate, Partner of Optimal Designs at the National Consultancy Congress held at New Delhi on January 15, 2007.

 

The Jumeriah Beach Residence (JBR) in Dubai is considered to be one of the biggest residential development projects in the World. Optimal Designs was responsible for Structural Designs in JBR Sector IV, which had 8 Towers with heights varying up to 180 meters, connected by a Common Podium having Parking Basements and a Retail Area. This assignment has earned Optimal Designs a substantial Foreign Exchange and a lot of Goodwill. This must be one of biggest assignments done by Indian Engineers in a record time: 5Million Sq. Ft. constructed in Two Years.

 

bu Peer Review Assignments of "Optimal Consultancy Services Pvt. Ltd”
bu1 Peer Review of Designs has been the speciality of Optimal. Optimal was engaged to carry out Peer Review of the flowing prestigious Projects.
bu2 Hotel Hyatt Regency, Kathmandu, Nepal.
bu2 Hotel Oriental Radisson, Kathmandu, Nepal.
bu2 Hotel Grand Hyatt, New Delhi.
bu2 Hotel Grand Hyatt, Mumbai.
bu2 Hotel Hyatt Regency, Goa.
bu2 Hotel Four Seasons, Mumbai.
bu2 Hotel Novotel at Dubai Currently under Execution.
bu2 Hotel Grand Chola for ITC at Chennai currently under Execution.
bu2 Textile Mill Commercial Building – I for Bombay Dyeing Currently under Execution.
bu2 IT Park at Maneser Gurgaon for AN Buildwell Pvt Ltd.
bu2 Group Housing at Gurgaon for IREO Management Pvt. Ltd.
bu2

Hotel Four Seasons for Westcourte Developers, Bangalore - Currently under Execution

bu2 Hotel Trident Oberoi at Hyeferabad, Currently under Execution
bu2 Hotel at Raipur for Hyatt: Currently under Execution
bu2 Two Hotels for Maker Maxity at Mumbai -Concept Stage
bu2 Chartered Hotels at Raipur - Ongoing
   

Major Projects Completed:

Vatika Triangle One of the most modern structures in and around Delhi
Escorts Hospital at Jaipur Optimal Structural Solution to complex Hospital Requirements.
Technical Facility for Defence Challenging Blast Resistant Structures have been Designed and Executed
132 kV Indoor Substations in UAE Optimal has great speciality in Designing 132 kV/33kV/ 11 kV substation structures with Basements in UAE. 26 Substations have been done by Optimal Designs so far.
Civil Designs for 2x 100 MW Gas Turbine Plants in UAE Complete Civil Designs for  GE (France) and ETA ( UAE) in Ras Al Khaima and Fujeirah
Lal Durbar Palace 150 Old Palace was restored with Banquet Hall inside, the office block houses U S Embassy in Nepal

Doha City Centre Expansion Project:
Optimal has been engaged by HOK Toronto who are the Lead Architects and  MSCEB Bahrain for Structural Design of Doha Five Hotels: Hotel Marriot Courtyard

  • Hotel Marriot
  • Renaissance,
  • Hotel Shangri-La,  
  • Hotel Rotana,
  • Hotel Merweb

All Five Hotel Towers are 200 M high connected by a common Podium which is 8 Storey High with 3. Basements.  Total Built Up Area is 4.6 Million Sq, Ft.

Hotel Movenpick at Jumeriah Beach Residence, Dubai Recently Completed

Vivanta (Business Hotel for Taj) in ITPL, Bangalore

Recently Completed

 

Major Projects Currently Uunder Execution:

 

   
bu2

Shopping Mall and Hotel for MBD at Ludhiyana – Ongoing

bu2

Hotel Radisson at MBD Ludhiana – Ongoing

bu2

West bay Tower in Business Bay Dubai

bu2

Vatika Technology Complex a: 1.8 Million Sq. Ft of Commercial Complex, Faridabad – Ongoing

bu2

Vatika City; A Condominium Project of 2.5 Million Sq. Ft Area - Completed

bu2

Sobha City at Thrissur, : A Mixed Use Development of 3.5 Million Sq. Ft in Thrissur, South India – Ongoing

bu2

Shopping and Retail for Bombay Dyeing: 1.8 Million Retail area including Parking at Mumbai – Ongoing

bu2

Vatika Professional Point at Sohna Road, Gurgaon for Vatika Group – Ongoing

bu2

Pavallian Heights at Greater Noida for Jaypee Group. – Ongoing

bu2

Commercial Development for EMAAR Group at Gurgaon. – Project Stopped

bu2

Villas at Ludhiyana for IREO Management Pvt. Ltd. - Ongoing

bu2

Formula – 1 Circuit at Greater Noida for JPSK Sports Pvt. Ltd.- Ongoing

 

Business Hotels for Chartered Hotels at: Ongoing

  • Ahmadabad.
  • Hampi.
  • Raipur.  
  • Trivandrum,
bu2

Hotel Hyatt Regency Extension, Kolkatta.- Ongoing

bu2

Hotel Hyatt Regency, Ahmadabad. – Ongoing

bu2

Luxury / Upscale Hotel Complex at Dial Hospitality District, Delhi – Ongoing.

bu2

Cricket Stadium at Greater Noida for JPSK Sports Pvt. Ltd.- Ongoing

bu2

Factory at Noida for DS Group - Ongoing

bu2

Office Complex at Delhi for DS Group - Ongoing

bu2

Hotel Hyatt Regency Extension, New Delhi - Ongoing

bu2

Vatika INXT City Centre (COM12) at Gurgaon - Ongoing

 
bu2

Vatika Town Square (RET004) at Gurgaon - Ongoing

 
bu2

Universal Square at Gurgaon - Ongoing

 
bu2

Residential Complex at Goregaon, Mumbai for RNA Corp. - Ongoing

bu2

Residential Complex at Sewri, Mumbai for RNA Corp. - Ongoing

bu2

Expansion of Sir Gangaram Hospital at New Delhi - Ongoing 

bu2

Fortis Healthcare Hospital at Ludhiana - Ongoing

bu2

bu2  
bu2  
bu2  
bu2  
  400/ 220/132/33/11 kV SUBSTATIONS
bu2

132/11 kV Substations for structures Telecommunication City on behalf of ETA, Dubai, Ongoing.

bu2

132/11 kV Substations for structures Dubai Silicon Oasis on behalf of ETA, Dubai, Ongoing.

bu2

132/11 kV Substations for structures Dhiyafa on behalf of ETA, Dubai, Ongoing.

bu2

132/11 kV Substations for structures Bohairah on behalf of ETA, Dubai, Ongoing.

bu2

132/11 kV Substations for structures Lost City on behalf of ETA, Dubai, Ongoing.

bu2

Six Substations for structures Palm Deira (SAHIL, PORT, WONDER, DILD, FETR, CDRA) on behalf of AREVA AND ETA, - Ongoing.

bu2

Fair and Show Substation for ETA – Ongoing

bu2

Palm Jebel Ali Substation on behalf of Siemens– Ongoing

bu2

Dubai Promenade Substation on behalf of Siemens – Ongoing

bu2

ANCR Substation on behalf of AREVA – Ongoing

bu2

GLFS Substation on behalf of AREVA – Ongoing

bu2

SHPG Substation on behalf of AREVA – Ongoing

bu2

Alain Road Substation on behalf of ETA– Ongoing

bu2

Barsha Residential Substation on behalf of ETA– Ongoing

bu2

Consulates Substation on behalf of ETA– Ongoing

bu2

Jadaf Substation on behalf of ETA– Ongoing

bu2

Horse Race (400/132 kV) Substation on behalf of AREVA – Ongoing

bu2

Al Barsha (400/132 kV) Substation on behalf of AREVA – Ongoing

bu2

400 kV Car Complex Substation on behalf of Siemens – Ongoing

bu2

400 kV Dubai Land 2 Substation on behalf of Siemens – Ongoing

bu2

Civil / Structural engineering for M/s. Sunshine Soaps Pvt. Ltd. (part of Ruchi Group) for their grass root soap plant at Gandhidham (Civil cost approx 10 Crores) (2005-2006).    Ongoing.

   
   
   
   

 

 

 

 